Wastewater treatment plant survey

Form 1 — quick assessment for the plant owner. Leave blank anything you do not have; our survey team will complete it on site.

Document: GW-XIRIS-QF-01Rev. 01
SECTION 1 — PROJECT INFORMATION
1
ID-01
2
ID-02
3
ID-02bYou can list several people — one per row; use "Add row" for each extra contact.
Full nameJob titlePhoneEmail
4
ID-03
5
ID-04
6
ID-05
7
ID-06
m³/day
m³/day
m³/tháng
8
ID-07multiple answers allowed
9
ID-08List them from the largest flow down, stating the industry where known. These sources typically account for at least 70% of the plant flow and load.
Discharge source / factoryFlow m³/dayShare of total flow %Main characteristic pollutants
Step / 4
SECTION 2 — PROCESS INFORMATION
10
PR-01
m³/h
m³/h
m³/day
11
PR-02table — 8 fixed rows
ParameterDesignMin measuredMax measuredTreated value
COD (mg/L)
BOD₅ (mg/L)
TSS (mg/L)
NH₄⁺-N (mg/L)
TN (mg/L)
TP (mg/L)
pH
Colour (Pt-Co)
Oil & grease (mg/L)
12
PR-03
13
PR-04table — 25 fixed rows
No.Unit / SkidYesNumber of tanks / linesCommon pain points
Coarse / fine screen
Grit & oil-grease removal
Equalisation tank
Coagulation - flocculation
Physico-chemical clarifier
DAF flotation
Heavy metal removal
Anaerobic / UASB
Anoxic (A/O)
Aerotank
SBR
MBBR
MBR
Secondary clarifier
Secondary coagulation / colour removal
Advanced oxidation (AOP)
Activated carbon filter
Disinfection
Sand / carbon filter
Water reuse (MF/UF/RO)
Sludge thickener / digester
Sludge press
Sludge drying bed
Emergency pond
Odour control system
14
PR-05multiple answers allowed
Step / 4
SECTION 3 — INFRASTRUCTURE
15
AS-01table — 5 fixed rows
Equipment typeQtyRated power kWBrandOriginVFDYear manufactured
Wastewater pump
Waste sludge pump
Recirculation pump
Mixer motor
Blower / aerator
Chemical dosing pump
16
AS-02table — 5 fixed rows
EquipmentYesQtyBrandOriginYear manufacturedWhat the owner would like to improve
Filter press
Belt press
Screw press
Decanter centrifuge
Sludge drying bed
17
AS-03bảng — 14 hạng mục
Sensor / meterFlowLevelP (mbar)pHDOORPTSS / MLSSOnline CODNH₄-N / TNTP / PO₄ColourTurbidityResidual chlorineElectricity meter
Inlet
Equalisation
Physico-chemical 1
Biological
Clarifier
Physico-chemical 2
Polishing
Sludge handling
Outlet
Control panel
Qty
Signal
Brand
Origin
Mfg year
18
AS-04table — 5 fixed rows
ItemBrand / modelOriginYear manufactured - Version
PLC
On-site HMI
SCADA
Backup generator
VFD
19
AS-06
Step / 4
SECTION 4 — OPERATIONS
20
OP-01Specific consumption is calculated automatically as Monthly consumption (kWh/month) ÷ Total actual monthly flow (m³/month) from item 6. You can still overwrite it with your own measured figure.
kWh/month
kWh/m³
21
OP-03table — 11 fixed rows
ChemicalConcentration as supplied C%Working concentration C%Total chemical used kg or L/monthDosing rate kg/m³ WWUnit / Skid
Before dilutionUsed
NaOH (caustic soda)
Sulphuric acid (H₂SO₄)
Hydrochloric acid (HCl)
PAC
Alum
Polymer (coagulation)
PAM (sludge dewatering)
Chlorine / Hypochlorite
Nutrients (N, P)
COD source (molasses, methanol, ethanol, glycerol)
Colour removal agent
22
OP-04
tonnes/day
tonnes/day
tonnes/day
%
weeks between
VND/month
23
OP-05table — 6 fixed rows
Operating taskLevelAutomation level %
Lift / transfer pump control
DO-based aeration control
Chemical preparation & dosing
Sludge wasting / recirculation
Sludge press operation
Logbook & reporting
24
OP-06
25
OP-07select up to 3
%
26
OP-08The top row is the highest priority. Use the number box at the start of each row to reorder.
No.Priority itemReason / what you expect
Energy savings
Chemical savings
Less manual work
Maintenance & reporting
Multi-level alerting
27
OP-09

Note on the scope of the survey: this allows X-IRIS to inspect the PLC and SCADA control programs, equipment and sensors on site.

Step / 4

Confidentiality: your data is used only for the technical assessment of this plant, is never transferred to third parties, is stored encrypted with access control, and will be returned or destroyed within 5 working days upon your written request.

Gọi điện thoại Gọi điện
Chat Zalo Zalo
Chat Messenger Messenger