X-IRIS Insights

Operational intelligence for modern water treatment plants.

Practical articles on Web-SCADA, AIoT, AI Predictor, compliance data and cost optimization.

GreenWorld · X-IRIS

Wastewater treatment plant survey

Form 1 — quick assessment for the plant owner. Leave blank anything you do not have; our survey team will complete it on site.

Document: GW-XIRIS-QF-01Rev. 01
SECTION 1 — PROJECT INFORMATION
1
ID-01
2
ID-02
3
ID-03
4
ID-04
5
ID-05
6
ID-06
m³/day
m³/day
%
7
ID-07

multiple answers allowed

8
ID-08

List them from the largest flow down, stating the industry where known. These sources typically account for at least 70% of the plant flow and load.

Discharge source / factoryFlow m³/dayShare of total flow %Main pollution characteristics
Step 1 / 4
SECTION 2 — PROCESS INFORMATION
9
PR-01
m³/h
m³/h
m³/day
10
PR-02

table — 8 fixed rows

ParameterDesignActual averageMax measuredTreated value
COD (mg/L)
BOD₅ (mg/L)
TSS (mg/L)
NH₄⁺-N (mg/L)
TN (mg/L)
TP (mg/L)
pH
Colour (Pt-Co)
11
PR-03
12
PR-04

table — 25 fixed rows

Unit / SkidYesNumber of tanks / linesCommon pain points
Coarse / fine screen
Grit & oil-grease removal
Equalisation tank
Coagulation - flocculation
Physico-chemical clarifier
DAF flotation
Heavy metal removal
Anaerobic / UASB
Anoxic (A/O)
Aerotank
SBR
MBBR
MBR
Secondary clarifier
Secondary coagulation / colour removal
Advanced oxidation (AOP)
Activated carbon filter
Disinfection
Sand / carbon filter
Water reuse (MF/UF/RO)
Sludge thickener / digester
Sludge press
Sludge drying bed
Emergency pond
Odour control system
13
PR-05

multiple answers allowed

Step 2 / 4
SECTION 3 — INFRASTRUCTURE
14
AS-01

table — 5 fixed rows

Equipment typeQtyRated power kWBrandOriginVFDYear installed
Wastewater pump
Sludge / recirculation pump
Mixer motor
Blower / aerator
Chemical dosing pump
15
AS-02

table — 5 fixed rows

EquipmentYesQtyBrandOriginYear installed
Filter press
Belt press
Screw press
Decanter centrifuge
Sludge drying bed
16
AS-03

table — 12 fixed rows

Sensor / meterInletEqualisationPhysico-chemicalAnoxicAerotankClarifierPolishingSludge handlingOutletControl panelQtySignalBrandOriginYear
Flow
Level
pH
DO
ORP
TSS / MLSS
Online COD
NH₄-N / TN
TP / PO₄
Colour / turbidity
Residual chlorine
Electricity meter
17
AS-04

table — 5 fixed rows

ItemBrand / modelOriginYear installed
CB / MCCB — power panel
PLC
On-site HMI
SCADA
Backup generator
18
AS-06
Step 3 / 4
SECTION 4 — OPERATIONS
19
OP-01
kWh/month
VND/month
VND/kWh
kWh/day
kWh/m³
20
OP-03

table — 9 fixed rows

ChemicalConcentration as supplied %Working concentration %Dosing rate kg/m³ WWQuantity kg or L/monthUnit / Skid
NaOH (caustic soda)
Acid (H₂SO₄ / HCl)
PAC / Alum
Polymer (coagulation)
PAM (sludge dewatering)
Chlorine / Hypochlorite
Nutrients (molasses, N, P)
Colour removal agent
Other
21
OP-04
tonnes/day
tonnes/day
%
weeks between
VND/month
22
OP-05

table — 6 fixed rows

Operating taskLevelAutomation level %
Lift / transfer pump control
DO-based aeration control
Chemical preparation & dosing
Sludge wasting / recirculation
Sludge press operation
Logbook & reporting
23
OP-06
%
%
24
OP-07

select up to 3

25
OP-08

table — add rows as needed (minimum 1)

Energy savingsChemical savingsLess manual workMaintenance & reportingMulti-level alerting
26
OP-09
Step 4 / 4

Confidentiality: your data is used only for the technical assessment of this plant, is never transferred to third parties, is stored encrypted with access control, and will be returned or destroyed within 5 working days upon your written request.

Gọi điện thoại Gọi điện
Chat Zalo Zalo
Chat Messenger Messenger