LATE DETECTION
Alerts appear too late, leaving teams able to react only after risks have already formed, increasing the likelihood of incidents spreading and affecting the entire operational process.
X-IRIS Operations Portal
Monitor operations in real time, identify issues early, and make better decisions with AI-driven insights.
Web-SCADA, dashboards, alarms and remote monitoring.
AI forecasting, anomaly detection and risk prediction.
Asset tracking, maintenance schedules and work orders.
Inventory tracking, dosing control and consumption analysis.
Automated reports, operation logs and inspection records.
X-IRIS | TECHNOLOGY COMPANY
X-IRIS develops software, Web-SCADA and AI solutions for management and operations. Our core wastewater solution connects PLC data, remote monitoring, equipment maintenance management and risk forecasting.
About X-IRIS
X-IRIS is a technology company developing software, data integration and AI for management and operations. Our current core solution focuses on smart wastewater operations with Web-SCADA, maintenance management and risk forecasting. We aim to expand into business management software.
Develop software, data and AI capabilities in Vietnam to address practical business management and operational needs.
Harness the power of data to help businesses monitor operations in real time, manage potential risks, and achieve sustainable growth.
Combining X-IRIS’s technological capabilities with GreenWorld’s more than 20 years of experience in environmental treatment, we deliver digital solutions that are closely aligned with real-world operational needs.
CHALLENGES
Alerts appear too late, leaving teams able to react only after risks have already formed, increasing the likelihood of incidents spreading and affecting the entire operational process.
Data is scattered across PLCs, SCADA, sensors, logs, maintenance records, and reports, forcing teams to perform more manual consolidation, making cross-checking difficult and slowing the detection of abnormalities.
A lack of benchmark data can cause energy and chemicals to be used beyond necessary levels, increasing operating costs.
SOLUTIONS
TARGET INDUSTRIES
CLOSED-LOOP OPERATIONS
Data does not stop at visualization — it becomes part of a continuous operational improvement loop.
Implementation Consulting
ROLE-BASED ACCESS
X-IRIS distributes information by each level's responsibility, helping everyone focus on exactly the data they need to act, coordinate, and decide.
OPERATIONS STAFF
MIDDLE MANAGEMENT
SENIOR MANAGEMENT
INFRASTRUCTURE
Assess integration against existing equipment, networks and data sources. Agree intervention windows, testing and a rollback procedure with the facility before deployment.
IMPLEMENTATION ROADMAP
Review PLC/SCADA, equipment, data and procedures. Agree priority scope, responsibilities and evaluation objectives.
Check signals, units, timestamps and data quality. Test permissions, logs and connection-loss alerts.
Compare alerts with actual events and record false alerts and missed events. Operators confirm response actions.
Evaluate against agreed criteria and hand over documentation, configuration, training and support scope.
Prepare for assessment
Choose a priority site or equipment group. Existing records help X-IRIS define connection scope, work to digitize and criteria for evaluating outcomes.
PLCs/SCADA, sensors, dataloggers, laboratory results and people authorized to provide data.
Identifiers, running hours, maintenance schedules, work orders and recurring incident records.
Who receives alerts, confirms work and approves a return to service.
Current energy, chemicals, treatment flow and costs to establish a baseline before evaluating investment benefits.
Operational knowledge
Practical guides to data, equipment and workflows for smart wastewater operations.
The preferred approach is to use existing equipment. X-IRIS reviews the facility’s PLC/SCADA systems, sensors, protocols and access permissions to identify what can connect, what needs adding and the agreed integration scope.
Connectivity depends on each facility’s protocols, equipment documentation, signal quality and access permissions. These conditions are reviewed and the selected data sources are tested within the agreed scope.
Web-SCADA helps compare energy, chemicals, flow, running hours and work records to identify improvement opportunities. Savings must be measured against the facility’s baseline and operating conditions; no fixed saving rate applies to every system.
AI examines trends and abnormal patterns in operating data. Before using alerts, teams check data quality, compare actual events and evaluate false alerts and missed events. Operators confirm actions under the approved response workflow.
Multiple sites can be monitored after agreeing network connections, data sources, permissions and alert responsibilities for each station. The scope is confirmed through assessment and testing.
Intervention time depends on the actual equipment, network and connection method. X-IRIS and the facility agree implementation stages, intervention windows, testing and rollback arrangements; uninterrupted deployment is not assumed for every system.
Prepare process diagrams, PLC/SCADA and equipment lists, sample data, maintenance records and priority incidents. Assessment helps both teams agree the problem, pilot scope, responsibilities and acceptance criteria before implementation.
READY FOR END-TO-END DIGITAL TRANSFORMATION?