X-IRIS Insights

Operational intelligence for modern water treatment plants.

Practical articles on Web-SCADA, AIoT, AI Predictor, compliance data and cost optimization.

X-IRIS | REPORTING & OPERATIONS DIGITALIZATION

FROM DAILY OPERATIONS TO TRACEABLE DATA.

Link report fields to traceable sources and retain review and approval responsibilities.

FROM DAILY OPERATIONS TO TRACEABLE DATA.

BENEFITS

LESS PAPERWORK. GREATER OPERATIONAL TRANSPARENCY.

PROCESS DIGITALIZATION

Convert checklists, shifts, and operating forms from paper/separate files into structured data.

REDUCE MANUAL WORK

Limit repetitive data entry, consolidation across multiple files, and manual information cross-checking.

TRANSPARENT TRACEABILITY

Clearly identify which tasks were completed, who performed them, and how the results were recorded.

FEATURES

RECORD. STANDARDIZE. TRACE WITH EASE.

X-IRIS connects operational data with human workflows, ensuring each activity is recorded at the correct step, by the correct role, and at the correct time, then automatically consolidates the information for management and reporting.

DIGITIZED SHIFTS & CHECKLISTS

DIGITIZED SHIFTS & CHECKLISTS

Step-by-step checklist: Tasks are organized according to the correct operating sequence. Completion confirmation: The next step only opens after the previous task has been completed according to the process. Accountability recording: Each action is linked to the person who performed it and the specific time. Reduce omissions: Help teams control tasks that remain incomplete during the shift.
ROLE-BASED ACCESS & ELECTRONIC APPROVAL

ROLE-BASED ACCESS & ELECTRONIC APPROVAL

Operator: Perform tasks and create operating forms. Manager: Review, coordinate, and approve within the assigned authorization scope. Supervisor: Provide final approval and control the results. Process traceability: Track the status of a form from creation through completion.
OPERATIONAL LOGS & HISTORY

OPERATIONAL LOGS & HISTORY

Time-based history: Retrieve data and activities by date or period.
Assigned performer: Know who performed an action and when.
Link monitoring data: Place operational parameters in context with the log.
Retrieve when needed: Support checking, cross-referencing, and reviewing past events.
AUTOMATED STATISTICS & REPORTING

AUTOMATED STATISTICS & REPORTING

Multi-source aggregation: Connect operational, energy, chemical, equipment, and maintenance data. Time-based statistics: Track by day, week, month, or a selected time period. Data standardization: Reduce time spent cross-checking across multiple files and information sources. Report export: Support data consolidation for management, inspection, and archiving

Before implementation

Records to prepare for this solution

Link report fields to traceable sources and retain review and approval responsibilities.

Templates:Current forms, audiences and reporting periods.
Sources:Tags, sample records and calculation rules.
Exceptions:Missing, corrected and unconfirmed records.
Approval:Reviewers, versions and release responsibilities.

QUY TRÌNH TRIỂN KHAI

Bốn bước triển khai

Bắt đầu từ hệ thống hiện tại, mở rộng theo nhu cầu

01

Agree scope

Choose a defined operating question, owners and acceptance criteria.

02

Check records

Bring a current report template, one period of data, applicable facility records and the responsible environmental contact.

03

Pilot and review

Test source quality, permissions and representative tasks in the agreed scope.

04

Accept and hand over

Compare outcomes with the criteria, record open issues and agree support and expansion.

READY FOR END-TO-END DIGITAL TRANSFORMATION?

Discuss a scope that can be tested

Request an assessment

Questions before implementation

Where should implementation start?

Link report fields to traceable sources and retain review and approval responsibilities.

Must existing equipment be replaced?

Replacement is not assumed. Check actual models, protocols, permissions and source quality. Document any necessary additions before agreeing the trial.

How are results accepted?

Agree measurable checks before the pilot. Retain source comparisons, user task results and open issues; define who confirms the outcome.

How are schedule and cost agreed?

They depend on sources, equipment, functions and intervention requirements. The assessment defines trial scope, responsibilities, cost items and acceptance evidence.

Operational knowledge

Prepare before implementation

Practical guides to data, equipment and workflows for smart wastewater operations.

View all articles →
Gọi điện thoại Gọi điện
Chat Zalo Zalo
Chat Messenger Messenger